Widening a doorway is a small cut with big consequences. The opening you make may sit in a wall that carries your roof or floor above, and behind the plaster there may be wiring or pipes. The safe way to do it in Sydney is to confirm what the wall does first, get the right approval, then cut, frame and finish in a set order. That is a structural alteration, and it is work we do every week as licensed builders: demolition, carpentry, structural alterations, plumbing, electrical and finishing, all under one project manager and backed by our 7-year workmanship warranty.

This guide is for homeowners, investors and families who want a wider doorway for easier movement, better flow between rooms or a more open feel. It explains what to check, what rules apply in NSW, how wide to go and how the job is done.

Mcarthurcg
mcarthurcg.com.au
Widen Your Doorway With Care
McArthur Constructions Group handles structural alterations and related renovation work for Sydney homeowners, with professional project management and a 7-year workmanship warranty.

Visit

TL;DR

Table of Contents

Why widening a doorway is not a simple cut

A doorway looks like a gap in a wall, but the wall around it is doing a job. In a house, a wall may hold up ceiling joists, a roof member, a floor above or a beam you cannot see. When you take out studs to make an opening wider, whatever sat on those studs needs another path to the ground.

That path is the header (also called a lintel): a horizontal member above the opening, carried at each end by posts or trimmer studs that run down to the floor and, in a load-bearing case, to a proper footing. In a non-structural wall, the header can be simple timber. In a load-bearing wall, it is a beam sized by an engineer.

The second reason to slow down is what lives inside the wall: power points, switch cables, water pipes, sometimes gas or stormwater. Moving these is licensed work. Our team covers plumbing and electrical alongside carpentry, which means the wall is opened, rerouted and closed by one crew rather than three trades arriving on different days.

Why widening a doorway is not a simple cut

Is the wall load-bearing?

This is the question that decides everything else, and the honest answer from the industry is that you cannot be certain from the room alone. A drafting and design firm in Sydney’s north advises against knocking into a wall to find out and says only a structural engineer can confirm it and design the beam, posts and footings if it is.

There are signs that raise the odds, and they are worth noticing before you call anyone:

The reverse also holds. A thin internal wall is not automatically safe to open, because it can carry the end of a roof member or a hidden beam. Photos of the roof framing above the wall help an engineer before the site visit.

If the wall is, or might be, load-bearing, get a structural engineer involved before anything is demolished. The engineer’s design becomes the drawing the builder works to, and the certifier reviews it as part of approval.

Approvals in NSW

Most people are surprised to learn that a doorway can need approval. The rule turns on the load-bearing question.

Under the NSW Codes SEPP (the state planning policy that sets out what work can be done without council consent), minor internal alterations are exempt only if they do not permanently alter the building’s load-bearing capacity. Removing part of a load-bearing wall generally falls outside that exemption and usually needs a CDC or development consent.

The two common pathways are:

  1. Complying development certificate (CDC). A fast-track approval for work that meets set standards. The NSW Government’s guide says council or a registered certifier assesses a CDC within 20 days, and a principal certifier must be appointed before construction starts.
  2. Development application (DA). Lodged with council when the work does not fit complying development, which is more common for heritage items, conservation areas and some units.

If you live in Vaucluse, Woollahra, Mosman or another area with heritage or conservation controls, check the status of your property early, because it can change which pathway applies. Strata properties add a further layer: the owners corporation usually has to agree to any change touching common property or structure.

We assemble the documentation a certifier needs with the engineer’s details, so the approval path and the build programme are planned together. Our home renovations and renovation advice pages explain how that planning works across a full project.

How wide should the new doorway be?

The right answer depends on who uses the house, now and in ten years. Standard internal doors in many Australian homes have a leaf of 820 mm or less, which leaves a clear opening noticeably narrower. That is tight for prams, laundry baskets, furniture, a walking frame or a wheelchair.

Two official benchmarks are useful here:

Benchmark Minimum clear opening Notes
ABCB Livable Housing Design Standard (base level) 820 mm Entry and internal doorways on the access path
ABCB Voluntary Standard, Beyond minimum for livable housing 850 mm Generally achievable with a 920 mm door leaf
AS 1428.1 (access and mobility) 850 mm Measured from the face of the opened door to the doorstop; for double doors it applies to the active leaf

The AS 1428.1 figures apply to doorways on a continuous accessible path of travel, which is a commercial and public-building concept more than a private-house one. For a home, they are a sensible design target rather than a legal requirement for every internal door. The standard also sets circulation space at the doorway, so there needs to be room to approach and manoeuvre, not just a wide gap. Which edition of the standard a project is assessed against can vary with the NCC version in use, so your certifier will confirm the one that applies.

In practice, a 920 mm leaf in a framed opening of roughly 1,000 mm or a little more is a good target for a single swinging door. If a wider opening would collide with a built-in or a corridor wall, a cavity slider is worth considering because it needs no swing space. A cavity slider needs a deeper wall and is a bigger structural and services job, so decide this before the engineer designs the header.

The work, step by step

Here is the order a professional crew follows, and what goes wrong at each step.

1. Measure and mark the new opening

Decide the finished clear width first, then work back to the framed width: add the door leaf, jamb thickness, and clearance. Mark the outline on the wall with a level, not by eye. Floors in older Sydney homes are rarely flat, so measure the door height from the finished floor level on both sides.

Where it goes wrong: marking to the old frame rather than the new door, and discovering later that the opening is 20 mm short.

2. Remove trims and open an inspection hole

Take off architraves and skirting in the cut zone. Then cut a small hole in the plasterboard and look inside with a torch and mirror for wires, pipes or other items to avoid. The wikiHow guide recommends turning off power to the area and wearing eye protection before cutting, which is sound basic practice. Any live circuit in the wall should be isolated and rerouted by a licensed electrician, and pipe changes done by a licensed plumber.

Where it goes wrong: cutting straight along the line and hitting a cable or a water pipe. Our crew handles the electrical and plumbing changes within the same job.

3. Support the structure if needed

If the engineer has specified it, temporary props (often called acrow props) carry the load above while the wall is opened. This step is not optional in a load-bearing wall.

4. Cut the plasterboard and remove the framing

Cut cleanly along the marked line, remove the old studs within the opening and any old header. In a brick or block wall, this becomes masonry cutting, which is dusty and needs the lintel installed with care.

5. Frame the new opening

Install the new header at the engineered size, the trimmer studs either side that carry it, and cripple studs above if the header sits below the ceiling line. Fix everything plumb and square. If the engineer specified a beam, posts and footings, this is when they go in, and the certifier may need to inspect them before they are covered.

Where it goes wrong: undersized timber, loose fixings, and an out-of-square frame that makes the door hang crooked forever.

6. Fit the jamb and door

Set the new jamb, shim it so it is plumb, and hang the door. Check the swing and the gap on all sides before you fix anything permanently. If the existing wall is thicker or thinner than the jamb, an extension jamb makes up the difference.

7. Patch, finish and paint

Fit new plasterboard around the frame, tape and set the joints, sand, prime and paint. Install new architraves and skirting. The visible quality of a widened doorway depends on this stage: a good patch disappears, a poor one shows as a ridge in the light for years. Where a doorway joins a room with timber floors or a new tiled floor, the transition needs planning too, so the threshold sits flush.

Our carpentry and finishing teams do this stage, and our carpentry services and custom joinery work means door, trim and any adjacent cabinetry can be made to match.

What affects the cost

The price of widening a doorway ranges widely because the jobs are so different. The main drivers are:

Because the structure decides so much, a number quoted before anyone has looked at the wall is a guess. A site visit gives you a fixed scope to price.

When a wider doorway is part of something bigger

Often, a wider doorway is the first step in a bigger plan: opening a kitchen to a living area, connecting an extension to the existing house, or making a ground-floor bathroom and laundry reachable for an older family member. Doing the doorway as part of the larger project usually means one set of approvals, one engineer’s report and one patch-and-paint pass instead of several.

If you are considering that kind of change, our guides to home extensions and home additions, approvals and planning show how structural openings are planned. If the doorway leads into a wet area, our bathroom renovations team coordinates waterproofing and tiling around the new opening.

Having us widen your doorway

We are a licensed Sydney builder working across the Eastern Suburbs, Lower and Upper North Shore, Northern Beaches and the Hills District, including Mosman, Vaucluse, Double Bay, Pymble and Wahroonga. A doorway job draws on exactly the trades we run in-house: demolition, carpentry, structural alterations, plumbing, electrical and finishing, managed as one project and covered by a 7-year workmanship warranty.

If you would like the wall assessed and the opening scoped, start with our home renovations page.

Mcarthurcg

Our view on widening doorways

We rarely see a doorway as a stand-alone job. It is usually the moment a family realises the house no longer works the way they live: the pram does not fit, a parent needs easier access, or the kitchen feels shut off from the rest of the house.

Our advice is to treat the wall as a structural question first and a carpentry question second. Know what the wall carries, get the engineering and approval in order, and only then decide the width, the door and the finish. Done in that order, the opening goes in cleanly, and the patching and painting are the only evidence anyone ever sees.

That is why we run the whole job ourselves, from demolition and structural alteration through plumbing, electrical, carpentry and finishing, with one project manager and a 7-year workmanship warranty. The result is a doorway that looks as though it was always there.

McArthur

FAQ

Can I widen a doorway myself?

The cutting is the easy part. The risks are in the wall: it may carry load, and it may hold cables or pipes that only licensed trades may alter. In NSW, work that changes load-bearing capacity also needs approval. Having a licensed builder handle it keeps the structure, services and certification in one place.

Do I need approval to make a doorway wider in NSW?

It depends on the wall. Minor internal work is exempt only if it does not permanently alter the building’s load-bearing capacity, so opening up a load-bearing wall usually needs a CDC or development consent. Heritage, conservation and strata rules can also apply, so confirm the status of your property first.

How wide should a doorway be for wheelchair or walker access?

Aim for a clear opening of at least 850 mm. The ABCB voluntary standard notes a 920 mm door leaf can generally achieve this. Leave room to approach the door from the side and to turn, not only a wide opening.

How do I know if a wall is load-bearing?

Check which way the joists run, whether the wall sits under another wall or on the house’s centre line, and what lands on it in the roof space. These are clues only. A structural engineer, working from the plans and a site inspection, is the person who confirms it.